Best Priced Home in Somerset Point! Pond Views, First-Floor Primary Suite, Climate-Controlled Workshop, Screen Porch & a Fully Fenced Yard. Tucked away in the peaceful Lady's Island community of Somerset Point, 47 Gadwall Drive West offers quiet Lowcountry living with everyday convenience close by. This well-maintained 3-bedroom, 2.5-bathroom home features an open floor plan, a spacious first-floor primary suite, and two additional bedrooms upstairs, creating a split-level layout that offers comfort, function, and added privacy for owners and guests alike. Positioned directly across from community-maintained green space and backing up to a peaceful stocked pond with fountain views, the setting feels calm, private, and connected to nature. Enjoy coffee on the screened porch, cast a line in the bass-stocked pond, or relax in the fully fenced backyard. Additional features include a 2-car garage with added shelving, a climate-controlled storage building with electricity and AC, and a portable generator connector for added peace of mind. For buyers considering school options, this home is zoned for Coosa Elementary School, Lady's Island Middle School, and Beaufort High School, with Beaufort Academy also conveniently located nearby on Lady's Island. Located approximately 10 minutes from Harris Teeter and Publix, 15 minutes from historic downtown Beaufort, and convenient to Port Royal, Parris Island, MCAS Beaufort, and Hunting Island State Park, this Somerset Point home offers a thoughtful blend of privacy, convenience, and Lowcountry charm. Schedule your private tour today and come see why 47 Gadwall Drive West may be the Somerset Point opportunity you've been waiting for.
| Start Time | End Time | Appointment Required? |
|---|---|---|
| No |
| Date | Event | Price | $/Sqft | Source |
|---|---|---|---|---|
| Listed For Sale Residential | $475,000 | $243 | Greco Group Brokered by eXp |
| Year | Annual Amount | Description |
|---|---|---|
| $2,538 | LOT 137 SUMERSET POINT AT LADYS ISLAND PH 1 PB131 PG134-135 FKA COOSAW RIVER ESTATESPH I FKA LOT 8 BLK PPB18 P64 PB95 P1 |
Elementary School Coosa Elementary | 3 miles away | PK - 05 | |
Elementary School Beaufort Elementary | 4.7 miles away | PK - 05 | |
High School Beaufort High | 5.3 miles away | 09 - 12 |